What's rework actually costing you?

Adjust the numbers to match your business. Conservative assumptions, Australian research, and no sales figures anywhere on this page.

Your numbers

$2,000,000
$500,000$10,000,000
6.0%
612

Australian research puts typical rework at 6–12% of contract value (Love & Edwards, 2005).

10 hrs
540
$55/hr
40150

Our assumptions (fixed, conservative)

  • · 50% of rework is driven by drawing and documentation errors.
  • · AI realistically catches 30% of those before site.
  • · Time reduction on admin work: 30%.

Conservative annual value, at your numbers

$26,580

Per month: $2,215

Left unfixed for five years

$132,900

That's not a projection of savings. It's what keeps walking out the door if nothing changes.

Rework recovered

$18,000

per year

Time value recovered

$8,580

per year

This is the cut-down model: two of four value levers, with the cautious defaults locked. The full version, with all four levers and your real numbers mapped month by month against an actual plan, is what you walk out of the Set-Out with.

Book your Set-Out

A simplified, conservative planning estimate for illustration only, not a guarantee of results. Rework rate is adjustable within the Australian research range; the model excludes upside from winning more work and from avoided vendor and risk exposure, both of which are covered in the Set-Out. Rework benchmark based on Love & Edwards (2005), Calculating total rework costs in Australian construction projects.

Want your numbers as a one-page summary?

We'll save your figures and follow up with a tailored view for your business.